Paper

Abstract: Implementation of a 2400-meter Long HTS Cable Line Project in the Power System of St. Petersburg

Volume Number:
19
Issue Number:
61
Author(s)
Viktor Sytnikov, Anatoliy Antonov, Mikhail Dubinin, Andrey Epifanov, Andrey Kashcheev, and Timofey Ryabin